Menu

Enegic

Dynamic charging load management for amina

Enegic is fully integrated with amina. Get access to data regarding your property's total power output and optimize your power usage with our advanced charging load management system.

Enegic and amina

Enegic's power management for amina

Advanced app

Control your EV charging directly from the app.

All-in-one

Advanced power management and solar production measurement are some of the benefits.

Enegic and installation.

Easy to install

Both Enegic and amina S are quick and easy to install.

AMINA S CONTROL

Hub

EV charging management system for amina S.

INFO

Load Balancing

Learn more about load balancing.

Compatible with all properties

Enegic's solution is compatible with all properties, ranging from small private homes 16A to building complexes of up to 2,5kA. In addition, Enegic is specifically designed to work regardless if you have a new or old electrical meter.

Powerlink is in charge of your amina S

Enegic Hub is our complete solution for managing charging stations. Paired with either an Enegic Monitor or Enegic Monitor one, it becomes one of our most advanced management and load balancing solutions to date. Therefore, we call this powerful combination of a Hub and a monitor Powerlink.

How Powerlink works

An Enegic unit measures the property's power consumption in real-time and communicates the available power to the Enegic Hub, which then oversees and optimizes the EV charging.

For this reason, the Enegic Hub comes bundled with either an Enegic Monitor or an Enegic Monitor one, depending on which solution suits the property best.

Enegic Monitor load balancing.

What is the Enegic Monitor?

The Enegic Monitor is an advanced solution for dynamic power management. We offer advanced monitoring of your electricity usage, as well as an advanced power management system for EV chargers.

Enegic reports the available power output, thus balancing the power curve and possibly saving you unnecessary electric costs.

By monitoring the property's total power output you are able to keep the main fuse from getting triggered.

Get the app

Information about the property’s power consumption is all available in the Enegic app. The app makes it easier than ever for you to load balance your EV charger, identify KPIs, and optimize your power usage.

Enegic and Amina.

Price Adapted Charging

For those of you with an electricity contract featuring hourly rates, there's the Price Adapted Charging feature. Just as it sounds: a function that charges your EV based on the lowest electricity prices available - completely automatically.

Enegic och elbilsladdning.

Get information about the property's total power output

Enegic monitors and communicates the property's total power output in real-time. Because Enegic constantly communicates the data, it creates the best opportunity for power optimization.

This means that you get all information about the total power output in a clear and accessible way – making it easier than ever to optimize your property's power usage.

To get a complete picture of the property's total power consumption, Enegic monitors the power consumption per phase. This will grant more detailed data.

Using Enegic with amina™ means:

Optimize

Lower your electricity costs by avoiding high power consumption.

Enegic load balancing.

Main fuse

Protect your main fuse with Enegic's automatic power management.

Enegic app

Our user-friendly app provides you with data about your property's power consumption. Control your power consumption via our app.

OptiCharge

Activate optiCharge to get EV charging that automatically adapt the charging to the lowest spot prices throughout the day.

Amina and Enegic.
Enegic is easy to install.

How to install Enegic with the amina S EV charger?

In the Enegic-amina integration, Enegic Monitor is installed at the same time as your EV charger. For every amina charger one Enegic Bluetooth Bridge is installed as well.

The current sensors are connected to the three phases of the property: L1, L2, and L3. For Enegic to work properly, the sensors are ideally installed as close to the distribution station as possible. Thereafter Enegic's charging load management will be installed. With Enegic one, installation via the P1/RJ12 port is also available.

The installation is usually performed by a certified electrician.

Do you have any questions?

If you couldn't find the answer to your question, you are always welcome to contact us.

shape

Phone

(+46) 8-564 860 60

Call us
shape
shape

Email

support@enegic.com

Send us an email
shape